| [1]康红普,姜鹏飞,冯彦军等.煤矿巷道围岩卸压技术及应用[J].煤炭科学技术, 2022, 50(06):1-15[2]KANG Hongpu,JIANG Penfei,FENG Yanjun,et al.Destressing technology for rock around coal mine roadways and its applications[J].Coal Science and Technology, 2022, 50(6):1-15[3]袁亮.低透气性煤层群无煤柱煤气共采理论与实践[J].中国工程科学, 2009, 11(5):72-80[4]YGAN Liang.Theory and practice of integrated pillarless coal pro-duction and methane extraction in multiseams of low permeability[J].Engineering Science, 2009, 11(5):72-80[5]柏建彪,周华强,侯朝炯,等.沿空留巷巷旁支护技术的发展[J].中国矿业大学学报, 2004, 33(2):183-186[6]BAI Jianbiao,ZHOU Huaqiang,HOU Chaojiong,et al.Development of Support T echnology Beside Roadway in Goaf-Side Entry Retaining for Next Sublevel[J].Journal of China University of Mining & Technology, 2004, 33(2):183-186[7]华心祝,马俊枫,许庭教.锚杆支护巷道巷旁锚索加强支护沿空留巷围岩控制机制研究应用[J].岩石力学与工程学报, 2005, 24(12):2107-2112[8]HUA Xinzhu,MA Junfeng,XU Tingjiao.Study on controlling mechanism of surrounding rock of gob-side entry with combination of roadside reinforced cable supporting and roadway bolt supporting and its application[J].Chinese Journal of Rock Mechanics and Engineering, 2005, 24(12):2107-2112[9]刘泉声,刘学伟,黄兴,等.深井软岩破碎巷道底鼓原因及处置技术研究[J].煤炭学报, 2013, 38(4):566-571[10]LIU Quansheng,LIU Xuewei,HUANG Xing,et al.Research on the floor heave reasons and supporting of deep soft-fractured rock roadway[J][J].Journal of China Coal Society, 2013, 38(4):566-571[11]谢广祥,常聚才.超挖锚注回填控制深部巷道底臌研究[J].煤炭学报, 2010, 35(8):1242-1246[12]XIE Guangxiang, CHANG Jucai.Study on overeutting-bolting & grouting-backfilling concrete to control the floor heave of deep mine roadway[J].Journal of China Coal Society, 2010, 35(8):1242-1246[13]康红普,张晓,王东攀等.无煤柱开采围岩控制技术及应用[J].煤炭学报, 2022, 47(01):16-44[14]KANG Hongpu, ZHANG Xiao, WANG Dongpan, et al.Strata control technology and applications of non-pillar coal mining[J].Journal of China Coal Society, 2022, 47(1):16-44[15]康红普.我国煤矿巷道围岩控制技术发展年及展望[J].岩石力学与工程学报, 2021, 40(01):1-30[16]KANG Hongpu.Seventy years development and prospects of strata control technologies for coal mine roadways in China[J].Chinese Journal of Rock Mechanics and Engineering, 2021, 40(01):1-30[17] 王作宇,刘鸿泉.承压水上采煤[M].北京:煤炭工业出版社,1993,14-17.[18]许延春,李见波.注浆加固工作面底板突水“孔隙-裂隙升降型”力学模型[J].中国矿业大学学报, 2014, 43(1):49-55[19]XU Yanchun,LI.lianbo"Pore-fractured lifting type" mechanical model for floor water inrush of the grouting enforcement working face[J].Journal of China University of Minin g & Technology, 2014, 43(1):49-55[20]康红普,陆士良.巷道底鼓机理的分析[J].岩石力学与工程学报, 1991, 10(04):362-373[21]KANG Hongpu, LU Shiliang.An analysis on the mechanism of roadway floor heave[J].Chinese Journal of Rock Mechanics and Engineering, 1991, 10(4):362-373[22]李见波,许延春,王新梅.注浆加固套管抗弯性能对煤层底板变形的影响[J].采矿与安全工程学报, 2017, 34(02):336-341[23]李见波,许延春,尹尚先.煤层底板加固中浆液充填套管的空间受力特征及其应用[J].煤炭学报, 2021, 46(7):2245-2253[24]LI Jianbo, XU Yanchun, YIN Shangxian.Stress characteristics of casing pipes filled with slurry and its application in grouting reinforcement for coal seam floor strata[J].Jounal of China Coal Society, 2021, 46(7):2245-2253[25]李见波,苗葳,李振华等.远场应力作用下底抽巷对底板隔水性能影响及加固技术优化[J].煤炭学报, 2023, 48(09):3336-3346[26]LI Jianbo,MIAO Wei,LI Zhenhua,et al.Influence of roadway under coal seam floor on the water resistance of coal seam floor strata with far field stresses and the optimization of control technology[J].Journal of China Coal Society, 2023, 48(9):3336-3346 |